RFP / RFQ Development and Management
On large scale projects, Amherst is usually asked to develop a Request for Proposal or Request for Quotation on turn key projects that require complete or near complete reconstruction. In many cases a restoration contractor is retrained to perform the initial emergency response that later leads into reconstruction. In doing so the contractor maintains control over all aspects of the reconstruction including the architectural and engineering disciplines essentially dictating control over the reconstruction including the costs. By developing an RFP/RFQ both the property owner, as well as, an insurer can control costs and avoid potential conflict later in the project by placing the project out to competitive bid.
Have questions or need assistance? Contact us now to discuss your project needs with our expert team to get started.
Our Recent Case Studies & Results
Our top priority is to devise customized legal strategies that are tailored to the unique legal needs of our clients, no matter how simple or complicated their situations, might be.
-
3.2 Million Hawaii high-rise residential building – fire in one unit
A fire occurred in a residential building in Honolulu destroying the interior of one unit and distributing varying amounts of smoke throughout the remainder of the building. The owner of the building retained the services of Public Adjuster (PA). The PA filed the repair claim on behalf of the owner/insured. The claim included repairs and cleanup but also included numerous code upgrades, the largest of which was replacement of all windows. The PA submitted a letter detailing that, as part of the fire repairs
-
Favorable Nevada community development – insurance claim for structural damage
The upscale community development included a total of 14,000 homes. The first 2,000 homes developed cracks in the foundation resulting in slab heaving, structural cracks and out of plumb structural walls, windows, ceilings, etc. The developer submitted an insurance claim for corrective repairs of the 2,000 homes in the amount of $50,000,000.00. The primary insurer paid policy limits for the claim.
-
8 Million New York City high-rise condominium building and retail plaza – Superstorm Sandy
The high-rise condominium office building and retail plaza experienced partial flooding in its subterranean parking garage. Located within the floor of the garage were two below grade electrical utility vaults, approximately 7 feet in depth, where multiple horizontal 480-volt power supply feeder cables were spliced together. At the time of the occurrence, this distribution system was de-energized. The vaults were manually pumped out and the distribution system was inspected and re-energized. The distributio
-
In Litigation Northern California car dealership – construction defect, new construction
A very centrally located, beautiful 32,000 sq. ft. new car dealership was built in 2016 in northern California. The facility included 13,000 sq. ft. contemporary designed showroom, 13,000 sq. ft. state-of-the-art service area and 6,000 sq. ft. of upstairs office area. As soon as the owner took possession of the building, plumbing problems started requiring digging up some of the showroom, first floor office area and service area floors.
-
8 Hundred Thousand Northern California High Rise Office Building – Water discharge on Floor 18
Amherst was retained by the insurance company for the 18th Floor Tenant. A piece of equipment used by the tenant was the source of the water discharge. Amherst's scope of work was to audit scope of work and costs claimed for repairs of the 18th Floor, the 17th Floor and the building core, mechanical chase and elevator cars, motors, cables and shafts . Amherst was retained to provide expert opinion as to the scope of work and costs that were found to be fair and reasonable.